Demo using UI
Step By Step
Demo
1. Step By Step
1.1 Create Savepoint:
Click the Savepoint button.
Enter a name in the dialog box.
Click Add → the system will store a new savepoint for the current step of the Dry Run.


1.2 Restore Savepoint:
Click the Restore button → a dialog opens showing all existing savepoints.
From the dialog, you can:
Apply a savepoint → the Dry Run resumes from that state.
Rename a savepoint.
Delete a savepoint.
Delete All Savepoints → removes all savepoints for the policy.

1.3 Continue After Editing Policy
You can stop the Dry Run, modify the policy in the editor, and then restart the Dry Run.
Note: If you make changes to blocks that are already linked to existing savepoints, restoring those savepoints may cause unexpected behavior.
Last updated
Was this helpful?